What is the lead time for the prototype?

The lead time for prototypes varies depending on the specifications, drawings, lens unit (single lens or multiple lenses combined), and prototype quantity, as well as other customer requirements.

*In case of single lens parts
For plastic lenses, the lead time is approximately 6 weeks from the closure of discussions on parts and mold specifications to the completion of molds, followed by molded product samples that meet specificfication in 6 to 10 weeks.
The lead time for glass lenses is approximately 4 weeks to arrange glass materials and processing jigs, and approximately 2 weeks to prepare samples.

The lead time for prototypes varies depending on the manufacturing method and materials used, so please feel free to contact us if you are considering making a prototype.